PLANNING & IMPLEMENTATION
Work in progress.
Designing and implementation of two full heat pump drying systems “RR” with 12 trolleys.
Installation new refrigerating station TN equipped with 3 DORIN H 1500 CC working at R449A.
Aging systems at “RR” full heat recovery with an enthalpy air exchange system.
and conversion of seven drying and aging systems from static ventilated to ventilated.
Two aging systems with an enthalpy air exchange system.
Designing and implementation of the new plant with 1.000 q. of weekly production at full heat recovery without boiler.
Designing and implementation of a new laboratory of refrigerating rooms, air conditioning systems, drying and aging systems.
Systems' adjustment to the new heat recovery technologies.
Designing and implementation of a new aging system of 7.000 kg. and of a drying system of 1.500 kg.
Designing and implementation of 0 °C to– 20 °C refrigerating systems for the new plant of freshly made pasta production.
Designing and implementation of a new 3.000 kg aging system.
Designing and implementation of a new 200 kg drying system.
Designing and implementation of a new 1.500 kg. drying system.
Drying systems maintenance.
Maintenance and upgrade of the existing drying systems.
Designing and implementation of two full heat pump drying systems.
Designing and maintenance of drying systems.
Designing, implementation and maintenance of a 50 q. drying system.
Designing and implementation of two full heat pump drying systems.
Designing, implementation and maintenance of two full heat pump drying systems.
Designing and implementation of a heat pump drying system.